West Virginia Department of Health & Human Resources Jackie Withrow Hospital
Project Cost $1,907,000; Size: 408,820 ft2
ZDS was the Prime for this project. Renovations included creating a central plant at one end of the large facility which included three 3,000 MBH, 125 psi steam boilers with upgrades to the condensate return system and comprehensive steam trap upgrades, providing a new gas service to the new boiler plant. The existing boiler plant in the opposite end of the large facility was upgraded to lengthen the life of it including a 2,500 MBH steam boiler. Several old or poor condition boilers were removed or isolated from providing heat to the system. The natural gas service upgrades were coordinated through the State Fire Marshal for approval to meet emergency backup fuel needs required by current code for both heating and emergency power.