Tucker County Schools Davis Thomas Elementary/Middle School
Project Cost $2,600,000
ZDS converted the existing all electric heating system to natural gas heating hot water system.Two new boilers were designed and installed in a new mechanical equipment room.The existing unit ventilators were replaced with ceiling suspended blower coil air handling units with new wall mounted outside air intakes.Later, a new air cooled chiller and full building DDC controls were designed and installed.Filtration was upgraded to meet current standards for schools in HVAC equipment and improve Indoor Air Quality.The kitchen hoods and HVAC were upgraded to the new energy efficient hoods while providing HVAC to keep the kitchen comfortable. Converting from all electric to natural gas heat provided for a lower operating, longer-lasting heating system.