Project Cost $3,265,000; Size: 103,847 ft2
HVAC, electrical system and lighting upgrades to improve Indoor Air Quality addressing current codes, improve energy efficiency and comfort. Provide DDC controls and outdoor ventilation with energy recovery dramatically reducing indoor CO2 levels for a better learning environment. Providing air conditioning for classrooms, cafeteria, kitchen, Auditorium and administrative offices. Project included an electrical service upgrade to accommodate the added HVAC loads. ZDS performed 3D Scan-to-BIM for reliable and accurate 3D capture of “built” conditions to use in design, bidding and construction and remote communication.