Ben Franklin Career & Technical Education Center

Kanawha County Schools
Ben Franklin Career Center

Project Cost $9,651,722; Size: 78,050 ft2

ZDS conducted an extensive study and performed 3D Scan-to-BIM of the facility that was utilized to develop comprehensive existing conditions and to assist KCS with procuring SBA funds. The work was done in two (2) phases for replacement of the aging  HVAC equipment, ductwork and piping and includes electrical upgrades to accommodate the new equipment, new lighting throughout, roof replacement and new exterior overhead doors for the shops. ZDS provided, Design, Bidding, Construction Administration and Commissioning services. Work designed/phased so construction could occur while school in use. ZDS included Faculty/Staff specific current HVAC, Electrical needs and Future IT Expansions in the Design.  Includes specialized custom energy-efficient HVAC to meet the challenging comfort and Indoor Air Quality needs for the Welding, Machine, Wood, Sheetmetal, HVAC, Diesel and Heavy Equipment Shops and school. EPAct qualified energy efficient design provides excellent long-term operating savings.     

 

© 2021 ZDS Design. All Rights Reserved.