West Virginia Department of Health & Human Resources Hopemont Hospital
Size: 124,800 ft2
ZDS’ initial work addressed their fire alarm needs. ZDS was then later contacted to provide master planning, boiler system upgrades and ARRA funded lighting upgrades. The boiler plant optimization initial phase involved replacing underground piping between the central plant and hospital, along with comprehensive steam trap upgrades.
This required engineering planning, design, supervision, preparation of construction documents, specifications, and construction administration of the boiler systems including lighting upgrades with replacement of T-12 lighting fixtures and incandescent lights with energy efficient T-8/T-5 and LED lighting, reducing lighting energy usage by over 30%.