135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f WV Division of Culture & History – State Capitol Complex WV Division of Culture & History On the grounds of the WV State Capitol Complex, the 228,500 square foot facility saves nearly $153,000 in annual energy costs while preserving the State’s priceless collection with proper HVAC, humidification, lighting, electrical and power generator systems. 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV … Continue reading “WV Division of Culture & History”
Clear Mountain Bank
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Clear Mountain Bank Clear Mountain Bank (formerly called Sabraton) ZDS provided comprehensive HVAC, plumbing and electrical engineering which included stringent bank security systems. 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS Design. All Rights Reserved.
Laidley Tower
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Laidley Tower, Charleston, WV Laidley Tower Laidley Tower is one of West Virginia’s tallest buildings rising 18 stories high. ZDS provided the Master Engineering Planning for the whole structure. 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS Design. All Rights Reserved.
Chase Tower
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Chase Tower, Charleston, WV Chase Bank Tower Chase Tower (formerly Bank One located in Charleston, WV) contains 271,000 square feet of office space and is a skyline focal point. ZDS replaced the core central HVAC system for the entire building. 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS Design. All Rights Reserved.
Burnsville Rest Area
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Burnsville Rest Area State of West Virginia Department of TransportationBurnsville Rest Area ZDS engineered the prototype for several Welcome Centers and Rest Areas in West Virginia. Working as a consultant to Chapman Technical Group, this project received the AIA WV Merit Award. OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS Design. … Continue reading “Burnsville Rest Area”
Washington & Lee University
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Washington & Lee University Washington & Lee University Project Cost $2,100,000 Engineering planning, design, commissioning and construction administration for District Cooling Renovations and other HVAC and Electrical systems. 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS Design. All Rights Reserved.
St. Patrick Catholic Church
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f St. Patrick Catholic Church St. Patrick Catholic Church 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS Design. All Rights Reserved.
Harvard University
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Hardard University – Arnold Arboretum Weld Hill Research Building Harvard UniversityArnold Arboretum Weld Hill Research Building LEED GOLD CANDIDATE 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS Design. All Rights Reserved.
Ohio University, Chillicothe
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Ohio University – Bennett Hall Ohio University, Chillicothe Project Cost $4,400,000 Addressed IAQ issues within Stevenson Library by providing the Engineering planning, mechanical and electrical design, consulting for establishing comprehensive Performance Contracting program coordinated with HVAC and electrical renovations to Stevenson Library, Bennett Hall and renovations to Shoemaker gym. 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV 25560 © 2021 ZDS … Continue reading “Ohio University, Chillicothe”
Ohio University, Athens
135 CORPORATE CENTER DRIVE / SUITE 532SCOTT DEPOT WV 25560 Linkedin-in Facebook-f Ohio University, Athens Campus Project Cost $25,000,000 Engineering planning, mechanical and electrical design, consulting for establishing comprehensive Performance Contracting program & Master Planning for District Cooling System covering entire campus from 1998 to 2000 then again a 2nd Performance Contracting program from 2010 until 2025. The projects also includes on campus student housing. 304 755 0075 Contact@zdsdesign.com 135 Corporate Center Drive / Suite 532 / Scott Depot, WV … Continue reading “Ohio University, Athens”
